End-to-End Transmission Line Construction, from First Survey to Final Stringing.

Three core disciplines delivered by experienced in-house teams, supported by specialist piling, grid station and civil works.

Workers concreting a deep tower foundation
01 · Core

Tower Foundations

Foundations executed to the geotechnical report and approved designs, from standard pad-and-chimney foundations to bored piles in river beds and waterlogged ground.

Excavation, dewatering and shuttering
Stub setting with templates and concreting to approved drawings
Pile foundations for river crossings
02 · Core

Tower Erection

Assembly and erection of lattice towers for 132, 220 and 500 KV lines, including rebuilding collapsed towers and shifting towers on existing routes.

Ground assembly with gin-pole (derrick) or crane erection
Emergency restoration of collapsed towers
Tower shifting and line re-routing
Crew and crane raising a crossarm on a 500 KV tower
Lineman on the conductor fixing spacers, 132 KV Jhimpir-II
03 · Core

Conductor Stringing

Tension stringing of conductor and earth wire using hydraulic puller-tensioner machines, through to sagging, clipping and pre-commissioning checks.

Hi-pot, insulation resistance, capacitance and impedance tests at commissioning
Sagging, clipping-in and spacers
Crossings over roads, railways and existing lines with protective scaffolding
Specialist · since 2007

Piling & River Crossings

Pile foundations for towers and grid stations where conventional foundations are not viable, including crossings of the Indus.

See the river crossing

Have a Tender or BOQ?

Share the drawings and quantities, and our team will respond with a programme and a competitive quotation.